Last updated: September 10, 2026
Fifteen items to fill in before you ask for an OEM quotation — and the three that change the minimum order.
An OEM order goes wrong in one of two ways: either the artwork arrives in a format the printer cannot use, or a specification that looked like a detail turns out to be a production change. This page is the specification sheet we work from on a panel fan OEM project. Fill it in before you request a quotation and the process is straightforward; leave gaps and the quotation will come back with assumptions in it.
For the commercial side of private label — what can be customised in general, the process step by step, and mould development — see our OEM and private label guide. This page is the panel-fan-specific specification detail.
| # | Item | Options | Type of change | Notes |
|---|---|---|---|---|
| 1 | Model and size | KLT-10B through KLT-30B, or a non-standard size | Print / label | Any current model can be OEM branded. |
| 2 | Voltage and frequency | 220 V 50 Hz, 220 V 60 Hz, 110 V 60 Hz, others on request | Motor build | A different frequency is a different motor batch. This is the item most often missed. |
| 3 | Plug type or hard-wired | Type G, Type C, Type A, or no plug | Assembly | The Gulf uses Type G. Specify explicitly — do not leave it open. |
| 4 | Cable length | Standard, or a specified length | Assembly | Longer cable is a small cost increase and avoids on-site extension joints. |
| 5 | Panel colour | Standard colour, or a specified RAL | Paint / resin batch | Non-standard colours carry a minimum batch quantity. |
| 6 | Panel printing | Your logo, model reference or brand mark | Print / label | Requires vector artwork. See artwork requirements below. |
| 7 | Grille style | Standard grille, or a specified pattern | Mould-dependent | A new grille pattern means tooling. Expect an MOQ and a lead-time impact. |
| 8 | Shutter configuration | Gravity auto-shutter (standard) or motorised | Assembly | Standard on the KLT series. |
| 9 | Timer or sensor | None, run-on timer, or humidity sensor | Assembly | A factory option, not a field modification — must be specified at order stage. |
| 10 | Individual box | Bulk carton only, or individual retail box | Packaging | Retail boxes add cost and volume. Allow for it in the loading plan. |
| 11 | Carton print | Your brand, model, quantity, country of origin | Confirm the exact text and language. | |
| 12 | Shipping mark | Your specified mark, or ours | Send the mark as artwork, not as a description. | |
| 13 | Certification label | Standard, or your own brand label | Label | The certificate stays in the manufacturer name; the label carries your brand. |
| 14 | Master carton quantity | Standard pcs per carton, or specified | Packaging | Changing it changes the CBM and therefore the container loading. |
| 15 | Palletisation | Loose cartons, or palletised to a specified standard | Packing | Palletising reduces container volume by 10 to 15 percent. |
The fifteen items above are not equally difficult, and the difference decides your MOQ and your lead time. Split them into three groups:
| Group | Items | Effect on MOQ and lead time |
|---|---|---|
| Print and label only | Panel printing, carton print, shipping mark, certification label | Lowest impact. Artwork setup is the main fixed cost, so this is where a modest order can still be branded. |
| Assembly and material variant | Voltage and frequency, plug type, cable length, panel colour, shutter configuration, timer or sensor, packaging format | Moderate. These consume a production batch, so the quantity per configuration has to be economic. |
| Tooling change | New grille pattern, non-standard panel shape, new mould | Highest. Tooling cost has to be amortised, which is why a new mould carries the largest minimum. |
Voltage and frequency sit in the middle group, and buyers treat them as if they were print. A 220 V 60 Hz unit for Saudi Arabia is a different motor batch from the standard 220 V 50 Hz build. It cannot be added as an afterthought to a production run that has already started.
This is where most OEM projects lose a week. Send artwork in a usable format the first time:
It depends on the type of change. Print and label only — your logo on the panel and the carton — carries the lowest minimum because the fixed cost is artwork setup. A different voltage or frequency, a different panel colour or a different packaging format needs an economic batch per configuration. A new grille or panel mould carries the highest minimum because tooling has to be amortised.
Vector files for anything printed: AI, EPS or PDF, with text converted to outlines, and colours given as Pantone or CMYK references. A JPEG or a screenshot cannot be printed cleanly on a moulded panel or a corrugated carton.
Yes. Panel printing, carton print, the shipping mark and the certification label can all carry your brand. The certification itself stays in the manufacturer's name, and your brand appears on the product label — this is normal practice and we will explain exactly how it appears on the documents.
Yes. A different voltage or frequency means a different motor batch, so it is treated as a separate configuration with its own economic quantity. This catches buyers out most often on Saudi Arabian orders, which need a 60 Hz motor.
Standard lead time is 15 to 25 days after deposit, depending on quantity. Add time for artwork approval and, on a first OEM order, for the pre-production sample. Projects that stall usually stall on artwork rather than on production.
Send your application, quantity and destination — our export team replies within one working day.
Request a Quote